WELL COMPLETION and STIMULATION
GEOPET
Bài giảng được soạn bởi
Bộ môn Khoan – Khai thác Dầu khí
Khoa Kỹ thuật Địa chất và Dầu khí
Đại học Bách Khoa TP. HCM
Tel: (08) 8647256 ext. 5767
GEOPET
Well Completion and Stimulation 2
CONTENTS
1. Basic Completion Methods
2. Completion Procedure
3. Perforating
4. Stimulation
GEOPET
Well Completion and Stimulation 3
1. BASIC COMPLETION METHODS
GEOPET
Well Completion and Stimulation 4
Once the design well depth is
reached, the f
93 trang |
Chia sẻ: huongnhu95 | Lượt xem: 392 | Lượt tải: 0
Tóm tắt tài liệu Bài giảng môn Khoan-Khai thác dầu khí - Bài 7: Well completion and stimulation, để xem tài liệu hoàn chỉnh bạn click vào nút DOWNLOAD ở trên
ormation is tested
and evaluated.
To complete the production well,
casing is installed and cemented,
and the drilling rig is dismantled.
A service rig is brought in to
perforate the production casing
and run production tubing along
with downhole equipments.
Production begins after surface
safety equipment installation
inished.
INTRODUCTION
30’’ CASING
20’’ CASING
13 3/8’’ CASING
7’’ LINER
RESERVOIR
SEA BED
PLATFORM
Production casing (9 5/8)
GEOPET
Well Completion and Stimulation 5
WHAT IS COMPLETION?
Well completion creates a
dependable pathway to the surface
for the hydrocarbons.
The term ‘completion’ describes
the assembly of downhole tubulars
and other safety equipments that is
required to enable the safe and
efficient production of oil or gas
from the well after it has been
drilled.
GEOPET
Well Completion and Stimulation 6
BASIC WELL COMPLETION TECHNOLOGY
Each drilled wellbore awaiting completion is unique. Even nearby wells
drilled to the same reservoir can have differencies in:
depths,
formation characteristics,
and hole sizes
A wide variety of equipment designs and procedures have been
developed to provide safe, efficient conduits from subsurface
reservoirs to the surface in different situations.
The ideal completion design
minimizes initial completion and operating costs,
providing for the most profitable operation of an oil or gas well over
its entire life.
GEOPET
Well Completion and Stimulation 7
Natural Completions
Natural completions are those in which little or no stimulation is required
for production. Sandstone and carbonate systems with good permeability
and mechanical stability are ideal for natural completions.
Stimulated Completions
These completions are generally applied to improve the natural drainage
patterns of hard, low-permeability formations. It is used to remove
barriers that prevent easy passage of fluids into the wellbore.
Sand-Control Completions
Sand-control completions support the formation while allowing the flow of fluids.
They are performed in young, unconsolidated or less mechanically competent
sandstones.
TYPE OF COMPLETION
GEOPET
Well Completion and Stimulation 8
TYPE OF COMPLETION
The design of a particular completion depends on:
1. The number and type of productive zones,
2. The expected pressures and flow rates,
3. The need to control sand production,
4. The need for artificial lift or stimulation the regulations
governing operations in the area.
GEOPET
Well Completion and Stimulation 9
WELL COMPLETION ACTIVITIES
Well completion activities include:
Conducting well test
Setting production casing
Running production tubing along with
downhole equipments
Installing surface safety equipments
Starting production flow
GEOPET
Well Completion and Stimulation 10
BASIC COMPLETION METHODS
Once we drill to the target and evaluate our well by
Mud analysis: density & viscosity
Well logging (electrical, ascoustic, nuclear, etc)
Coring: at bottomhole or sidewall
Welltest: bottomhole pressure vs time -> reservoir properties
Next decision is whether to complete or abandon it????
In the latter case:
set a cement plug or plugs in the hole,
possibly recover whatever casing can be removed,
and return the drill-site to its original condition.
The more fortunate is one in which our well not only is productive, but
economically justifies a completion.
GEOPET
Well Completion and Stimulation 11
The next step usually involves the running of the final string of casing - the
production string.
The manner in which this is done determines the basic completion
method and may follow one of several configurations: (interface between
the wellbore & reservoir)
the openhole completion,
the liner completion,
the cased and perforated completion
• Without liner
• With liner
BASIC COMPLETION METHODS
GEOPET
Well Completion and Stimulation 12
The openhole completion: the producing formation is not isolated by
the casing, which extends only to the top of the producing interval.
The slotted liner completion: which is not cemented and not "tied back"
to the surface.
BASIC COMPLETION METHODS
GEOPET
Well Completion and Stimulation 13
The cased and perforated completion
Without liner: cementing the production casing across the
productive interval and then perforating the casing for production
With liner: a liner is cemented and perforated as a cased and
perforated completion
BASIC COMPLETION METHODS
GEOPET
Well Completion and Stimulation 14
One of these configurations will be the basis for the completion design,
which may incorporate:
one or multiple strings of tubing: single, dual, or triple, etc
and a variety of tubing components to facilitate production
(production method): pumping, flowing, etc.
from one or multiple zones: single or multiple zones
For our purposes, a cased and perforated well with a single tubing
string will serve to illustrate the typical completion procedure.
BASIC COMPLETION METHODS
GEOPET
Well Completion and Stimulation 15
Subsea production systems are wells
located on the sea floor, as opposed to
at the surface. The safety equipments
are installed underwater on the seabed.
They enable early production from
deepwater, remote, and marginal fields.
Subsea production system offer a
means of producing field extremities not
reachable by directional drilling from
existing platforms, or where field
economics do not justify the installation
of one or more additional platforms.
SUBSEA COMPLETION
GEOPET
Well Completion and Stimulation 16
2. COMPLETION PROCEDURE
GEOPET
Well Completion and Stimulation 17
COMPLETION PROCEDURE
After the contract casing crew runs the final casing,
cementing follows the usual procedure, although stage
cementing may be necessary to cement an extremely long
string.
The production string has been hauled out to the location
and the inside diameter checked to make sure that
imperfections will not prevent the subsequent running in of
tubing and packers after the string is set.
GEOPET
Well Completion and Stimulation 18
Special care: to prevent the possibility of future leaks.
If stage cementing is necessary:
the bottom section is first cemented in place and then
a series of plugs are pumped down the casing to open ports that
allow the upper end of the annulus to receive cement.
After the cement has set, the inside of the casing must be
drilled out and
flushed clean of cement and other debris to a depth below that of
the proposed completion.
It is important that the inside diameter of the production casing be
clean and smooth.
COMPLETION PROCEDURE
GEOPET
Well Completion and Stimulation 19
COMPLETION PROCEDURE
It is also important that the cement
form a competent seal between the
casing and borehole over the entire
openhole interval. To ensure this,
an acoustic cement bond log is
sometimes run on wireline
to determine if voids exist
between casing and hole
because cement has bypassed
the drilling fluid.
GEOPET
Well Completion and Stimulation 20
COMPLETION PROCEDURE
If the bond is poor in an area, particularly if the area is between
productive formations, a cement squeeze will be required.
Often the cement bond log is run in conjunction with a gamma ray log
and a casing collar log. The drilling engineers can correlate this
gamma ray log with the logs run earlier during formation logging.
This correlation is important because as we zero in on the target - the
productive formation - our need to locate tools precisely relative to that
formation is critical.
The open hole logging sondes are subjected to a greater amount of
"drag" when being pulled up the hole, the depths at which formations
are recorded may differ somewhat from the formation depths on the
gamma ray log run inside the casing.
GEOPET
Well Completion and Stimulation 21
COMPLETION PROCEDURE
If we were to perforate the casing according to the openhole log
depths, we might miss the formation entirely. By using the correlation
log and casing collar log to set packers and perforate, we are assured
of precise placement.
At this point, many operators
move the drilling rig off location and
replace it with a less expensive, and often less powerful,
completion rig.
This gives the operator time to design the rest of the completion,
provide for a sales contract, and order equipment.
GEOPET
Well Completion and Stimulation 22
COMPLETION PROCEDURE
Whichever rig is used, the next step in the completion is to measure the
tubing while running it into the hole.
A careful count must be kept of the exact number of tubing joints run
into the hole and their total length.
With the tubing in the hole, the BOP stack, which is now attached
above the tubing head where the tubing will hang, may be tested.
The casing may also be pressure tested,
and a filtered completion fluid may be circulated into the well to
displace the drilling mud prior to perforating.
This fluid is usually a heavy brine, because it:
o provides the hydrostatic pressure needed to control the well,
o does not contain solids that can plug the perforations and
damage the formation.
GEOPET
Well Completion and Stimulation 23
COMPLETION PROCEDURE
If perforating is to be done at this point,
the tubing is removed and
the perforating gun is lowered and positioned according to the
correlation log and casing collars.
It is critical that the gun be placed precisely;
once inaccurate perforations are made, they can only be plugged
off with a costly cement "squeeze."
GEOPET
Well Completion and Stimulation 24
COMPLETION PROCEDURE
With the well perforated, it may now be time to stimulate the well by
either
acidizing or
hydraulically fracturing the formation.
Acid can be used to dissolve formation-damaging particles left by the
drilling mud or, in carbonate formations, to create flow passages by
dissolving portions of the rock itself.
Hydraulic fracturing involves the high-pressure pumping of fluid into
the formation to split the rock apart and increase its flow capacity of
tight formations.
GEOPET
Well Completion and Stimulation 25
COMPLETION PROCEDURE
Normally, a completion packer is run and set next, either incorporated
into the tubing string or set independently on electric wireline.
The packer is pressure tested to ensure its sealing ability. (Many
shallow, low pressure wells, however, do not require a packer to isolate
the casing from produced fluids.)
The tubing must then be "spaced out." This requires that a length of
tubing be removed from the upper end so that it can be "landed" in the
tubing head, which is some distance bellow the rotary table.
Once the tubing has been landed in the tubing head, a temporary plug
can be set inside the tubing while the BOP stack is removed and the
surface flow control equipment ("Christmas tree") installed. This plug
is then removed through the Christmas tree, and the well is completed.
GEOPET
Well Completion and Stimulation 26
COMPLETION PROCEDURE
Of course, this procedure will vary according to
the specific brands of equipment being installed,
the characteristics of the well,
and the policies of different companies,
but the essential sequence of operations will be followed.
One variation is the procedure for perforating, which may be done after
the tubing has been run.
This approach allows the formation to be perforated and immediately
"cleaned up" by allowing it to flow as soon as the perforations are
created.
GEOPET
Well Completion and Stimulation 27
COMPLETION PROCEDURE
The rig will often be moved off location at this point, allowing the well to
brought on production. On an offshore platform, the rig may be skidded
to the next well slot.
If a rod pump is required on the well, it may be installed at this time
and the necessary rods and downhole pumping mechanism run
into the tubing.
If gas lift valves have been incorporated into the tubing string, gas
may be used to blow the completion fluid out of the tubing and
permit the well to flow on its own.
In some cases, the well will be "swabbed in" at this point, by running a
close-fitting plunger into the tubing on wireline and pulling it back up,
thereby displacing the completion fluid in the tubing and allowing the
formation to flow.
GEOPET
Well Completion and Stimulation 28
COMPLETION PROCEDURE
After an initial well test, which may be conducted with temporary test
facilities, the flow line needed to produce the well on a continuous basis
will be connected.
GEOPET
Well Completion and Stimulation 29
3. PERFORATING
GEOPET
Well Completion and Stimulation 30
PERFORATING
The use of cemented steel casing to line the wellbore and isolate
producing zones is only practical when a method for easily reopening
those zones for production exists.
Jet perforating is the procedure whereby an explosive charge is used
to selectively open passages to the formation through the casing and
cement sheath. This method:
the most widely used today, because of its versatility and power.
Having evolved from the military bazooka, the jet perforator relies
on a conical-shaped charge of explosives to produce a high
pressure stream of particles.
Bullet perforators fire metal projectiles at the inside of the casing to
penetrate casing, cement, and rock.
This technique has pressure, temperature, and penetration
limitations that have made jet perforating the more popular choice for
completions.
GEOPET
Well Completion and Stimulation 31
PERFORATING
Jet perforating guns consist of
a carrier with a series of explosive charges linked together by a
detonating cord.
A variety of gun designs exist; they vary according to:
- the gun is to be run on an electric conductor line or attached to the
bottom of the tubing;
- the gun is to be run through the casing on electric line or tubing, or
is to be lowered through the tubing on electric line;
- the gun is retrievable following detonation or is expendable
(meaning it is destroyed when the gun is fired);
- the diameter and length of the perforation desired.
GEOPET
Well Completion and Stimulation 32
PERFORATING
Wider, longer perforations require
larger, stronger jet charges,
and, larger guns to hold them.
The charge itself is held in a metal case
that is linked to similarly shaped charges
by a detonating cord ending in an electric
detonator.
When the gun is fired, an electric current
from the surface sets off the blasting cap
detonator, which secondarily ignites the
detonating cord leading to the main
explosive charges.
GEOPET
Well Completion and Stimulation 33
PERFORATING
When a charge is fired
The metallic liner collapses to form a stream of
high pressure, high velocity jet particles.
Traveling at 30,000 ft/sec (9100 m/sec), the jet
stream strikes the casing at some 15x106psi
(100x 106kPa) a fraction of a second after
detonation, to form a perforation.
a) before detonation
b) after detonation, showing
collapsing liner & swelling casing.
c) volatilizing metal liner and
formation of particle
d) jet lengthens as process continues
GEOPET
Well Completion and Stimulation 34
PERFORATING
Retrievable hollow carrier guns have cylindrical steel bodies with
closed ports opposite each jet charge.
Fully expendable guns enclose the charges in a frangible aluminum or
ceramic case that disintegrates on firing.
while semiexpendable guns consist of wire or metal strip carriers that
are retrieved after firing.
Through-casing and through-tubing guns of these types differ primarily
in the diameter of the gun
• 3 to 5 inches [7.6 to 12.7 cm] for casing guns,
• 1 to 2 inches [2.5 to 5.1 cm] for tubing guns
and in the size of the jet charges.
GEOPET
Well Completion and Stimulation 35
PERFORATING
Type of perforating guns
• Retrievable hollow carrier guns
• Fully expendable guns
• Semi expendable guns
GEOPET
Well Completion and Stimulation 36
PERFORATING GUNS
GEOPET
Well Completion and Stimulation 37
PERFORATING
As mentioned earlier, perforating can be carried out in several different
ways:
Conventional overbalanced perforating is done through casing with an
electrical conductor line and heavy fluid in the hole. This completion
fluid is usually a low-solids solution of sodium or potassium chloride, or
sodium or potassium bromide.
Conventional underbalanced perforating is usually carried out after
tubing has been run and equipment is installed to control the sudden
pressure surge when the higher pressure formation is opened to the
lower pressure wellbore.
GEOPET
Well Completion and Stimulation 38
PERFORATING
For a typical formation the difference between wellbore and formation
pressure may be 300-500 psi (2000-3500 kPa).
For a low permeability formation, the typical difference between
wellbore pressure and formation pressure may be 2000 psi (13,800
kPa) or higher. -> the immediate surge of formation fluids to prevent
the clogging of the perforation tunnels with debris.
When a maximum pressure differential is desired, a tubing-conveyed
perforating gun may be used.
it is possible to have the tubing run empty with a ported vent, which
opens when the packer is set.
After firing, the gun component of the tubing is released with a
wireline shifting tool to allow full flow into the tubing.
GEOPET
Well Completion and Stimulation 39
PERFORATING
In addition to perforation diameter and length, two important
considerations in all types of perforating are
the shot density
and phasing of the perforations.
The shot density, or shots per foot, is usually 2, 4, 8,12, or 16 holes in
each foot of perforated interval.
GEOPET
Well Completion and Stimulation 40
PERFORATING
Phasing pertains to the direction of each successive shot relative to its
neighbors;
if each charge is pointed 90 away from the next, we have 90
phasing.
In the case of 180 phasing, each shot points directly opposite from
the next one in the carrier.
Gun phasing can be particularly important when perforating a fractured
well, a highly deviated well, or a multiple completion, where the gun
must be oriented to avoid perforating an adjacent tubing string.
GEOPET
Well Completion and Stimulation 41
PERFORATING
The decision about the interval to be perforated is often made by the geologist
or by the engineer and geologist responsible for the area in which the well is
drilled.
Consideration will be given to maximizing flow rate and minimizing
production problems such as produced sand, water coning, or excessive
gas production in an oil well.
The decision is often made after careful review of the log and core data
back at the company office.
The geologist's input concerning net pay, sidewall core descriptions, and
the areal extent of sand intervals can be crucial in determining the best
interval to be perforated.
One of the advantages of the cased and perforated completion: ability to
selectively stimulate specific formations.
GEOPET
Well Completion and Stimulation 42
MULTI-LAYER PERFORATION
GEOPET
Well Completion and Stimulation 43
4. Stimulation
• Acidizing
• Fracturing
GEOPET
Well Completion and Stimulation 44
STIMULATION
In many cases,
acidizing
or fracturing
is a routine part of the completion program.
Either type of stimulation may also be applied soon after a well
has been completed and
has tested at lower production rates than expected.
Stimulation may also be part of a remedial or "workover" program
designed to improve productivity following a decline in production.
GEOPET
Well Completion and Stimulation 45
STIMULATION
Stimulation will often follow a formation pressure buildup test that was
run to determine if the cause of low productivity was
permeability reduction near the wellbore,
low permeability throughout the reservoir,
or low reservoir pressure.
Acid stimulation can improve the first condition,
while fracturing is necessary to significantly improve the second
condition.
Of course, the third condition can only be helped by pressure
maintenance.
GEOPET
Well Completion and Stimulation 46
STIMULATION
Both acidizing and fracturing procedures involve the pumping of fluids
down the tubing or drillpipe and into the formation.
In fracturing, the objective is to apply enough pressure to actually split
the formation apart, thereby enhancing its flow capacity.
In acidizing
sandstone formations, the objective is to squeeze acid into the
existing pore spaces of the rock matrix; this improves productivity
by removing formation damage and dissolving clay particles.
In carbonate formations, acid treatments are designed to enhance
permeability by actually dissolving part of the rock matrix.
Acid-fracturing treatments are designed to create fractures that are
simultaneously widened by acid dissolution.
GEOPET
Well Completion and Stimulation 47
Acidizing
GEOPET
Well Completion and Stimulation 48
ACIDIZING
Successful acidizing involves more than
simply
pumping acid down the well
and allowing it to dissolve part of the
formation.
The type of acid used, the chemicals
added to improve its efficiency, the
volumes pumped, and the pumping
pressures maintained are dependent on
the characteristics of the reservoir rock
and fluids
and the configuration of the well.
Acidizing
GEOPET
Well Completion and Stimulation 49
ACIDIZING
Hydrochloric acid (HCl) is the most common chemical used in
acidizing.
A solution of 15% HCl by weight is most often used in limestone or
dolomite formations,
while a mixture of 12% HCl and 3% hydroflouric (HF) acid is often
used on sandstone formations with interstitial clays, particularly in
areas such as the Texas and Louisiana Gulf Coast of the United
States.
Organic acids, such as acetic acid, or formic acid, are also sometimes
used.
GEOPET
Well Completion and Stimulation 50
ACIDIZING
A variety of additives help the acid work more efficiently.
Inhibitors prevent the acid from attacking the steel tubing and casing at
high bottom hole temperatures.
In some applications, retarders can prevent the acid from spending
quickly on the first formation rock it encounters, allowing the acid to be
pumped further into the formation.
Surfactants added to the acid help prevent acid/oil emulsions from
forming and reducing the ability of the fluids to flow.
Because the reaction of acid and iron compounds can create
precipitates within the formation, iron sequestering agents are added
to control these deposits.
GEOPET
Well Completion and Stimulation 51
ACIDIZING
Some acid treatments are even designed to generate acid within the
formation, again allowing deeper penetration of active acid.
In acid fracturing, it is important to keep the acid from leaking away as
a fracture spreads out from the wellbore. Fluid loss agents can be
added to keep the acid inside the fracture and allow it to penetrate
farther into the formation.
Temporary plugging agents are also added, during matrix acidizing
jobs, to divert the acid into different layers of the formation and improve
overall permeability.
GEOPET
Well Completion and Stimulation 52
ACIDIZING
Preflush fluids designed to prepare the formation for
the acid,
the acid plus its additives,
and the displacing fluid that follows the acid,
are all pumped at rates ranging from less than one barrel per minute to
perhaps more than ten barrels per minute.
GEOPET
Well Completion and Stimulation 53
ACIDIZING
The actual rates will depend on the calculated fracture pressure
required to split the formations, and whether a matrix or fracture
treatment is preferred.
Volumes of 50 to 200 gallons of acid per vertical foot of formation are
typical for most reservoirs, depending, of course, on the porosity and
rock type.
The acid solutions are delivered to the wellsite in specially lined tanks
brought by truck to land locations and delivered by boat to offshore
wells.
GEOPET
Well Completion and Stimulation 54
ACIDIZING
High-pressure piping is connected to the well and the acid is pumped
down the hole ( Figure ).
GEOPET
Well Completion and Stimulation 55
ACIDIZING
The size and configuration of the tubing in the well is important in
calculating the volume of fluid required to completely displace the acid
into the formation.
If gas lift valves or other points of communication exist between tubing
and casing, precautions must be taken to ensure that acid is not
pumped into the casing/tubing annulus
and allowed to corrode the casing.
GEOPET
Well Completion and Stimulation 56
Fracturing
GEOPET
Well Completion and Stimulation 57
FRACTURING
As early as 1900, oil producers used explosives to "shoot" wells.
By detonating nitroglycerin opposite the producing formation,
the wellbore was enlarged and
the surrounding rock shattered.
As would be expected, this technique was
dangerous and
often damaging to the casing.
Hydraulic fracturing
GEOPET
Well Completion and Stimulation 58
FRACTURING
In the 1940s: the inadvertent splitting of the strata during drilling or
cementing might be purposefully carried out in a potentially productive
formation to increase permeability.
The idea was
to pump fluid into a cased and perforated wellbore until the
hydraulic pressure caused the formation to part;
continued pumping would force the fluid into the fracture,
propagating the fracture farther and farther from the wellbore.
GEOPET
Well Completion and Stimulation 59
FRACTURING
Early researchers realized that the fracture would close once the
hydraulic pressure was relieved,
a solid material is added to the fracturing fluid to "prop" open the
fracture.
Initial jobs consisted of perhaps 500 to 1000 gallons of gelled kerosene
(napalm) as a fracturing fluid, with perhaps 1/2 lb of sand per gallon
(Neely 1977).
These early fractures were assumed to be horizontal, following
the bedding planes of the rock.
GEOPET
Well Completion and Stimulation 60
FRACTURING
Since that time, an enormous amount of research and field application
of fracturing techniques has been carried out.
Theoretical mathematical models have been developed that permit
engineers to predict the type of fracture and productivity increase that
will result from a certain magnitude fracture treatment.
These calculations prevent the unnecessary use of enormous amounts
of
costly fracture fluid,
proppant material,
and equipment horse power
by tailoring the treatment to the particular well.
GEOPET
Well Completion and Stimulation 61
FRACTURING
Although there is still some disagreement among theorists concerning
the behavior of rock under stress, we now know that:
Fracture orientation is dependent upon geologic conditions,
And that most fractures are vertical rather than horizontal.
GEOPET
Well Completion and Stimulation 62
FRACTURING
In order to significantly improve a well's productivity, a fracture must
conduct fluid at a rate that is several orders of magnitude greater than
the conductivity of the rock itself.
Creating a high-conductivity fracture involves
selecting the appropriate fluid, additives, and proppant,
determining the optimum volume of material to be pumped,
pumping the material at the appropriate rate and pressure.
GEOPET
Well Completion and Stimulation 63
FRACTURING
Desirable features for a fracturing fluid include
the ability to remain in the fracture and not leak off into the formation,
the viscosity necessary to transport the proppant into the fracture,
the ability to flow back into the well easily after depositing the
proppant,
and low cost.
Water-based polymer solutions are popular, as are gel led hydrocarbons
for water-sensitive formations.
A wide variety of additives are available to reduce fluid friction in piping,
prevent fluid loss from the fracture, control contamination, and insure
compatibility with the formation.
GEOPET
Well Completion and Stimulation 64
FRACTURING
The standard proppant used to hold open the fracture is silica sand.
Sand can be crushed, however, in deep formations where fracture-
closure stresses are high.
In such cases sintered bauxite, zirconium oxide, or other high-
strength materials are substituted for sand.
The goal is to create at least a partial monolayer of proppant within the
fracture, holding the fracture open, but not plugging it completely.
GEOPET
Well Completion and Stimulation 65
FRACTURING
High-strength proppant forms a single layer of particle that holds open
the fracture and permits flow
GEOPET
Well Completion and Stimulation 66
FRACTURING
At the wellsite, the equipment required for a large fracturing job is
somewhat more sophisticated than that required for an acid
stimulation.
The fracturing fluid is held in tanks, where any necessary additives are
mixed.
Proppant is sorted in similar containers, from which it is conveyed to
high-rate blenders.
Blend
Các file đính kèm theo tài liệu này:
- bai_giang_mon_khoan_khai_thac_dau_khi_bai_6_well_completion.pdf